
45
3 CHAPTER 3 - PACKING, TRANSPORT AND STORAGE
Only skilled personnel who are familiar with the lift and this manual shall be allowed to carry out
packing, lifting, handling, transport and unpacking operations.
3.1
PACKING
The lift is delivered in many components that appears sub-assembled.
The lay-out is referred to the model.
The
model on-floor installation
:
No. 2 base units, each one with a platform and hydraulic cylinders
No. 1 control box equipped with hydraulic unit
No. 1 box containing hydraulic lines, connecting cables, four rubber blocks, stickers and
technical documentation
No. 4 drive-on ramps (2 front and 2 rear ramps) equipped with protective devices to
connect platforms
The model in-ground installation
:
No. 2 base units, each one with a platform and hydraulic cylinders
No. 1 control box equipped with hydraulic unit
No. 1 box containing hydraulic lines, connection cables, four rubber brackets, 40 mm high,
stickers and technical documentation
No. 2 holes covers
If requested, optional accessories are available to satisfy each customer’s requirements (Ref.
accessories manual and price lists).
The lift is packed in a single box on a wooden bed, wrapped up in non-scratch waterproof material
and sealed with 2 straps.
The average of the package is
520 kg
3.2
LIFTING AND HANDLING
When loading/unloading or transporting the equipment to the site, be sure to use suitable loading
(e.g. cranes, trucks) and hoisting means. Be sure also to hoist and transport the components
securely so that they cannot drop, taking into consideration the package’s size, weight and centre
of gravity and it’s fragile parts.
Figure 1 – PACKAGE AND HANDLING
Hoist and handle only one package at a time
Содержание ERCO 500
Страница 14: ...14 Figura 4 LAYOUT PSS MONOFORBICE ESTENSIONE...
Страница 15: ...15 Figura 4a LAYOUT PSS MONOFORBICE CON FLAP...
Страница 16: ...16 Figura 4b LAYOUT PSS MONOFORBICE ESTENSIONE CON OPERA CIVILE...
Страница 17: ...17 Figura 4c LAYOUT PSS MONOFORBICE CON FLAP CON OPERA CIVILE...
Страница 21: ...21 Figura 7 SCHEMA ELETTRICO...
Страница 29: ...29 Figura 16 COLLEGAMENTO TUBI IDRAULICI A B F...
Страница 51: ...51 Figura 4 LAYOUT PSS MONOFORBICE WITH ESTENSION...
Страница 52: ...52 Figura 4a LAYOUT PSS MONOFORBICE WITH FLAP...
Страница 53: ...53 Figura 4b LAYOUT PSS MONOFORBICE ESTENSION WITH FRAME...
Страница 54: ...54 Figura 4c LAYOUT PSS MONOFORBICE FLAP WITH FRAME...
Страница 58: ...58 Figure 7 ELECTRICAL DIAGRAM...
Страница 66: ...66 Figure 16 HIDRAULIC HOSE CONECTION A B F...
Страница 87: ...Figura 4 PLAN D ENSEMBLE F...
Страница 88: ...Figura 4a PLAN D ENSEMBLE F...
Страница 89: ...Figura 4b PLAN D ENSEMBLE F...
Страница 90: ...Figura 4c PLAN D ENSEMBLE F...
Страница 94: ...F Figura 7 SCHEMA ELECTRIQUE...
Страница 102: ...F Figure 16 RACCORDEMENT DES TUYAUX HYDRAULIQUES A B F...
Страница 124: ...124 Bild 4 LAYOUT...
Страница 125: ...125 Bild 4a LAYOUT...
Страница 126: ...126 Bild 4b LAYOUT...
Страница 127: ...127 Bild 4c LAYOUT...
Страница 131: ...131 Bild 7 ELEKTROSCHALTPLAN...
Страница 139: ...139 Bild 16 ANSCHLIESSEN DER HYDRAULIKLEITUNGEN A B F...
Страница 161: ...Figura 4a DISE O DESARROLLADO...
Страница 162: ...Figura 4b DISE O DESARROLLADO...
Страница 163: ...Figura 4c DISE O DESARROLLADO...
Страница 167: ...Figura 7 ESQUEMA EL CTRICO...
Страница 175: ...Figura 16 CONEXI N DE LOS TUBOS HIDR ULICOS A B F...