
Rooftop Packaged Service Manual MAINTENANCE
75
5. Take down the
electric box.
Unscrew the screws
(indicated by the
arrows),and then take
down the electric box.
Note:
Power cord may be
fixed by bundles, so loose the
bundles before taking out the
electric box.
6. Re-install the
electric box.
Put the electric box back
and tighten the screws.
Then reconnect all
connection lines that had
been take down, and refix
the Power cord with
bundles at original
locations.
Note:
The line connection
must accord to the schematic
diagram. All cable can not
contact the pipe and moving
parts such as fan.
7. Re-install the
electric box
cover.
Put the electric box back
and tighten the screws.
8. Re-connect
power cord.
/
Re-connect power cord
according to wiring
diagram adhered on
eletric box.
Note:
After connection,
arrange leading wires and
refix them with bundles at
original locations. All cable
can not contact the pipe and
moving parts such as fan.
Close the cover plate of
electric box hermetically.
Содержание CH-IRT05NM
Страница 4: ...Rooftop Packaged Service Manual PRODUCT 1 PRODUCT ...
Страница 10: ...Rooftop Packaged Service Manual CONTROL 7 CONTROL ...
Страница 12: ...Rooftop Packaged Service Manual CONTROL 9 1 2 HEATING OPERATION ...
Страница 36: ...Rooftop Packaged Service Manual INSTALLATION 33 INSTALLATION ...
Страница 39: ...Rooftop Packaged Service Manual INSTALLATION 36 CH IRT08NM CH IRT15NM ...
Страница 49: ...Rooftop Packaged Service Manual INSTALLATION 46 CH IRT15NM CH IRT15NM ...
Страница 50: ...Rooftop Packaged Service Manual MAINTENANCE 47 MAINTENANCE ...
Страница 101: ...Rooftop Packaged Service Manual MAINTENANCE 98 5 EXPLODED VIEWS AND SPARE PART LIST Model CH IRT05NM ...
Страница 110: ...Cooper Hunter International Corporation www cooperandhunter com ...