
Rooftop Packaged Service Manual MAINTENANCE
73
8. Re-install fan
sub-assy.
Re-insatll the whole fan
sub-assy and then fix the
screws indicated by
arrows.
9. Re-connect
power cord.
/
Re-connect power cord
according to wiring
diagram adhered on
eletric box.
Note:
After connection,
arrange leading wires and
refix them with bundles at
original locations. All cable
can not contact the pipe and
moving parts such as fan.
Close the cover plate of
electric box hermetically.
10. Re-install the
cover plate
Put the cover plate back
and tighten the screws.
Содержание CH-IRT05NM
Страница 4: ...Rooftop Packaged Service Manual PRODUCT 1 PRODUCT ...
Страница 10: ...Rooftop Packaged Service Manual CONTROL 7 CONTROL ...
Страница 12: ...Rooftop Packaged Service Manual CONTROL 9 1 2 HEATING OPERATION ...
Страница 36: ...Rooftop Packaged Service Manual INSTALLATION 33 INSTALLATION ...
Страница 39: ...Rooftop Packaged Service Manual INSTALLATION 36 CH IRT08NM CH IRT15NM ...
Страница 49: ...Rooftop Packaged Service Manual INSTALLATION 46 CH IRT15NM CH IRT15NM ...
Страница 50: ...Rooftop Packaged Service Manual MAINTENANCE 47 MAINTENANCE ...
Страница 101: ...Rooftop Packaged Service Manual MAINTENANCE 98 5 EXPLODED VIEWS AND SPARE PART LIST Model CH IRT05NM ...
Страница 110: ...Cooper Hunter International Corporation www cooperandhunter com ...