
Rooftop Packaged Service Manual MAINTENANCE
68
8. Reconnect power
cord of compressor.
/
Reconnect the power cord into
compressor according to the
procedure of disconnecting power
cord. The line connection must
accord to the schematic diagram.
Note:
The connection box of
compressor must be re-covered to
resisting water. All cable can not contact
the pipe and moving parts such as fan.
9. Re-install the cover
plate.
Put the cover plate back and tighten
the screws.
10. Recharge
refrigerant.
Connect refrigerant tank with nozzle
of low pressure (indicated by the
maker) for recharging refrigerant.
Note:
Check the leak after finishing the
connectionpipes. Charge amount should
be consistent with nameplate.
NOTE:
Above diagrams may be different from actual model.
Содержание CH-IRT05NM
Страница 4: ...Rooftop Packaged Service Manual PRODUCT 1 PRODUCT ...
Страница 10: ...Rooftop Packaged Service Manual CONTROL 7 CONTROL ...
Страница 12: ...Rooftop Packaged Service Manual CONTROL 9 1 2 HEATING OPERATION ...
Страница 36: ...Rooftop Packaged Service Manual INSTALLATION 33 INSTALLATION ...
Страница 39: ...Rooftop Packaged Service Manual INSTALLATION 36 CH IRT08NM CH IRT15NM ...
Страница 49: ...Rooftop Packaged Service Manual INSTALLATION 46 CH IRT15NM CH IRT15NM ...
Страница 50: ...Rooftop Packaged Service Manual MAINTENANCE 47 MAINTENANCE ...
Страница 101: ...Rooftop Packaged Service Manual MAINTENANCE 98 5 EXPLODED VIEWS AND SPARE PART LIST Model CH IRT05NM ...
Страница 110: ...Cooper Hunter International Corporation www cooperandhunter com ...