6-23
Assembly Manual: Tube
Revised 12.2019
Fig 207 - Drip pan
Fig 208 - Anchor electrical wire
Fig 209 - Anchored wire from light
Fig 210 - Discharge working light
6.7.2 Install Drip Pan:
102. Install the Drip Pan under the windguard,
between the Slide and Drive Box.
- Place notched end of Pan into Slide.
- Use clamp to hold each corner of pan in
place under windguards.
- Use a 13/64 inch (5 mm) drill bit.
- Drill 5 holes along each side.
- Rivet windguard to drip pan.
6.7.3 Optional Wiring Harness and Lights:
If your conveyor includes the optional lights and
actuator package, a wiring harness is included.
103. Connect the coloured wires on the electric
actuator to the corresponding colours in the
#16 gauge roll of wire.
- Encase wire connection in conduit.
104. Drill holes in discharge housing and
windguards to attach anchor clips for wire
routing.
Note:
Mount anchor clips using the
top screw at each roller bracket.
Drill 1 or 2 holes between for additional
clips.
105. Install the work light onto its mount below
the second last (from the discharge) return
roller bracket.
- Connect the black and white wires to the
#16 gauge wire, laid along the tube.
- Encase the “T” joint in conduit.
- Wrap the joint with electrical wire.
- Secure the wire with anchor clips to the
windguard using existing screws.