6-17
Assembly Manual: Tube
Revised 12.2019
Fig 188 - Straight tube
Fig 189 - Upward bow in tube
82. Sight along top of conveyor tube, to confirm
the tube is straight - side to side.
Note:
If curved:
tighten cable on outside of arc,
or loosen cable on inside of arc.
83. Sight along the side of tube, to confirm it has
a slight upward bow in it.
- Tighten cable with the discharge end eye
bolts, to set bow.
Note:
Tube must have an upwards bow to it
at this time in assembly process.
Installation of windguards and placement
on undercarriage will bring tube downward.