Manuale di Istruzioni
Instruction Manual
Rev.1 EN
23/08/2018
75
5.
Press the
key to save (or the button
to keep the old parameters)
and to access to the
TEST EXECUTION
screen;
Fig. 4-24
6.
When ready, turn ON the pump motor by pressing the relevant switch (note that the
pump motor switch is self retaining when the mains electricity supply is connected);
in the meantime, set lever A up and lever B back on the flow control valve (rapid
approach phase);
Fig. 4-25
7.
Before the sample comes in touch with the machine upper platen, zero the load
reading on the
WIZARD 2
display by pressing the
key. This may be
necessary to eliminate loads which may be indicated because of friction of the thrust
group or the effect of the weight of distance pieces;
NOTE:
Do not zero the load reading once the sample has been subjected to loading.
A
B
Содержание WIZARD 2 50-C13A0X
Страница 2: ......
Страница 37: ...Manuale di Istruzioni Instruction Manual Rev 1 EN 23 08 2018 35 Fig 2 9 Dimension and fixing of 50 C92A1X...
Страница 38: ...Manuale di Istruzione Instruction Manual 23 08 2018 Rev 1 EN 36 Fig 2 10 Dimension and fixing of 50 C92A2X...
Страница 118: ...Manuale di Istruzione Instruction Manual 23 08 2018 Rev 1 EN 116 Note...
Страница 119: ...Manuale di Istruzioni Instruction Manual Rev 1 EN 23 08 2018 117 Note...
Страница 120: ......