Contrel EMA-D6 Скачать руководство пользователя страница 3

 

pag. 3 / 22

 

Installation 

1. Turn off all power supplying this device and the equipment in which it is installed before working on it. 
2. Always use a properly rated voltage sensing device to confirm that all power is off.  
 

Removing from a DIN rail  

1. Using a flat screwdriver 

(≤ 6.5 mm / 0.25 in), lower the locking 

                 2. Lift the device up to free it from the DIN rail. 

clip to release the device. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

First commissioning  

At first power up of EMA-D6 network analyzers, wizard procedure will guide the user in the first commissioning steps: 
 
1. Set the language (please refer to section 

Utility menu

2. Set the type of wiring connection (please refer to section 

Measure menu - Wiring connection

3. Set the current transformers primary and secondary (please refer to section 

Measure menu - Transform ratio

4. Set the neutral current transformers primary and secondary (please refer to section 

Measure menu- Transform ratio

5. Set the voltage transformers primary and secondary (please refer to section 

Measure menu- Transform ratio

6. Set the date and time on the device (please refer to section 

General menu - Date & Time

 

Access to device 

The network analyzer features a front panel with signaling LEDs, a graphic color display and contextual menu buttons for accessing the information required to 
operate and modify parameter settings. The navigation menu allows you to display, configure and reset parameters. 
 

General display 

The general display of the power metes is shown in the following picture: 
 

A

 

Title bar 

B

 

Favorite page 

C

 

Phase indication 

D

 

Measurements and unit of measure 

E

 

Cancellation or navigation key among the visualization pages 

F

 

Up 

G

 

Down 

H

 

Confirmation or navigation key among the visualization pages 

To enter the menu and configuration mode 

 
 
 
 
 
 

 
 
 
 
 

 
 

Info menu 

 

Menu 

Description

 

Device 

Revision software-Revision hardware-Serial number-Info wiring-Work hours-Options info 

I/O 

Digital input/output status-Analog output status 

Setpoint 

Info setpoints 

Date/Time 

Time and date 

COM monitor 

Communication traffic (RS-485 and Ethernet) 

Log summary 

Info logs 

Log details 

Viewing logs 

ON/OFF events 

Power supply switch ON/OFF 

Содержание EMA-D6

Страница 1: ...pag 1 22 INSTRUCTION MANUAL IM114 U v0 2 EMA D6 DIN rail network analyzer with basic power quality analysis...

Страница 2: ...rated via the front of the device to guard against unauthorized access Description Modular DIN rail housing 6 modules Backlighted LCD display True RMS measurements For current transformers x 1 A and x...

Страница 3: ...ase refer to section Measure menu Transform ratio 6 Set the date and time on the device please refer to section General menu Date Time Access to device The network analyzer features a front panel with...

Страница 4: ...gs to enter configuration mode press and keys Select the required sub menu with keys and confirm with To exit setup and go back to the readings viewing press The following table show the available sub...

Страница 5: ...atically scaled in order to fit the waveforms on the screen The graph is automatically updated every refresh time selected by the user DISPLAY menu Every page shows the total harmonic distortion THD a...

Страница 6: ...anages the date and time that is used for storage of events for measurements log and for time related functionalities The EMA D6 is equipped with RTC real time clock then the time and date are kept up...

Страница 7: ...s programming and definition refer to setup menu SETPOINT chapter For more information on how the meter handles the setpoint driven alarms refer to the figure below Data logger function The data logge...

Страница 8: ...oint Log Logic expression Password Reset Date Time Utility Display Graphics Editing contacts Transform ratio Time window Frequency DIP SWELL Wiring Convention Type Modality Energy Counter Ethernet LAN...

Страница 9: ...the log memory both events and measurements log 12 ON OFF events Clears the power supply switch ON OFF events 13 Setpoint DO Manual command in order to reset the digital output of the alarm setpoint...

Страница 10: ...V 205000 10000 2000000000 6 Interruption hysteresis mV 275000 10000 2000000000 7 Storage End memory FIFO End memory 1 Threshold active when the voltage is lower than value set 2 The duration of voltag...

Страница 11: ...d capacitive apparent energy 6 10 Set a value of energy meters L2 for active energy imported and exported reactive energy inductive and capacitive apparent energy 11 15 Set a value of energy meters L3...

Страница 12: ...16 daily plans HOLIDAY n n 1 48 UoM Default Range 1 Month holiday January January December 2 Day holiday 1 1 31 3 Plan holiday Daily plan 1 Daily plan 1 16 NOTE HOLIDAY menu supports a maximum of 48...

Страница 13: ...when EMA D6 will be configured as Slave ETHERNET optional UoM Default Range 1 IP Address 10 0 0 100 000 000 000 000 255 255 255 255 2 Subnet mask 255 0 0 0 000 000 000 000 255 255 255 255 3 IP gateway...

Страница 14: ...ulse counter is divided by this coefficient 4 Status on activation of the input Allows reversing the logic of the input function 5 When digital input is using as SP DO reset select the number of setpo...

Страница 15: ...t be compared with limits 5 Used to define the upper threshold 6 Used to define the unit of measure of the upper threshold 7 Used to define the lower threshold 8 Used to define the unit of measure of...

Страница 16: ...e memory is full you can choose to stop the recording End Memory mode or to continue overwriting the oldest records FIFO mode 4 5 6 7 Set the variables driven by date range or and time interval that c...

Страница 17: ...gies Digital inputs Counters Analog input Math 11 Item 2 OFF measures 12 Multiplier 2 1 1 100000 13 Divisor 2 1 1 100000 NOTE this menu is divided into 8 sections for logic expression LE1 8 1 Expressi...

Страница 18: ...neutral voltage VL3 23 A signal COM2 RS 485 optional 6 Phase current IL3 output S2 15 Not used 24 B signal COM2 RS 485 optional 7 Neutral current IN input S1 optional 16 Neutral conductor VN 25 A sign...

Страница 19: ...e phase measuring two conductors without voltage transformers 6 Three phase measuring four conductors balanced multiple loads with one current transformer with three current transformers Connection ty...

Страница 20: ...ransformer Connection type 3X1PH Digital outputs connection L Load F Fuse V 12 250 VAC 150 mA max 10 300 VDC 150 mA max Digital inputs connection Input voltage 24 or 48 or 115 or 230 VAC DC to be defi...

Страница 21: ...ce ph n 1 65 Mohms Power consumption per phase 0 09VA AC current inputs Rated current 1 A or 5 A Measuring range For 1 A scale 10 mA 1 A For 5 A scale 50 mA 5 A Type of input Isolated inputs by intern...

Страница 22: ...5 Ethernet 10BASE T or 100BASE TX auto sensing Connector type RJ45 Protocol supported Modbus TCP Connections Type of terminal Screw fixed Number of terminals 36 Conductor cross section 0 2 2 5 mm2 Tig...

Отзывы: