4 6
In st ru c t io n m an u al
C o n e r g y IP G s t r in g in v e r t e r s e r ie s
6 In s t a lla t io n a n d c o m m is s io n in g
E
N
G
L
IS
H
If you do not use a generator junction box, leave the sealing
plugs in place on the connector.
6.9
Connecting further string inverters
If you have chosen to use the Internet-based Conergy
SunReader monitoring system, connect the Conergy IPG
series string inverters to one another with a CAN cable.
Connect the first inverter to the Conergy SunReader (
CAN In
)
(see Fig. 6-1, page 35, pos.
(1)
). Fit a terminator to the last
inverter (see chapter 6.10, page 46). The terminator is
included in delivery of the Conergy SunReader.
If you do not use a Conergy SunReader, leave the sealing
plugs in place on the connectors
6.10
Connecting the terminator
You must install a 120
Ω
terminator at the end of a CAN
connection. The terminator is included in delivery of the
Conergy SunReader. The terminator is installed as a bus
connector between pin 4 (CAN-high) and pin 5 (CAN-low) in
an adapter.
Connecting further string inverters
1. Screw one end of the CAN cable to the first string inverter
(
CAN In
).
2. Screw the other end of the CAN cable to the next string
inverter (
CAN Out
).
CAUTION!
Short circuit due to inadequate terminator.
An inadequate terminator can cause damage from a short
circuit.
Connecting the terminator
1. Connect the adapter with the integrated terminator to the
CAN Out
connection.
2. Tighten the plug by turning manually.
Содержание IPG 4000
Страница 1: ...Conergy IPG string inverter series Operating manual ...
Страница 13: ...12 Instruction m anuall C o n e r g y IPG s t r in g in v e r t e r s e r ie s 2 Sa fe t y ENGLISH ...
Страница 62: ...IPGSTRING IM ENG 0611 www conergy com Subject to technical modifications without notice 2006 Conergy AG ...