Receiving and Storage
Receiving and Storage | 4
2594949_B_EN_2005_Condair-RH_OM
Condair RH
Inspection
After receiving the shipment, inspect the goods as follows:
l
Inspect the shipping boxes for damage. Report any shipping box damages to the shipping
company without delay.
l
Check the goods against the packing slip to ensure that all items have been delivered. Report
any shortages to Condair within 48 hours of receipt of the goods. Condair does not assume
responsibilities for any shortages beyond this period.
l
Unpack the parts/components and check for any damage. If parts/components are damaged,
notify the shipping company immediately.
l
Verify the model type on the specification label to ensure that it is suitable for your installation.
Storage, Packaging, and Transportation
Storage
Store the Condair HumiLife RH in its original packaging inside a protected area that meets the following
requirements until it is installed, or if it needs to be stored for an extended period of time:
l
Room temperature: 41 to 104 °F (5 to 40 °C)
l
Room humidity: 10 to 75% RH (non-condensing)
Transportation
For optimum protection always transport the unit and components in their original packaging.
Packaging
Keep the original packaging of the unit/components for later use.
If the packaging needs to be disposed, observe local regulations on waste disposal. Please recycle
packaging where possible.
Содержание HumiLife RH Series
Страница 31: ...Page intentionally left blank...