24
Hydraulic connection of the nebulizers
6
Hydraulic connection of the nebulizers
6.1
Installing the high-pressure hose
The water is pressurized up to 85 bar and is fed from the removable console of the high-pressure pure
water system (HighPur, TrePur, DuoPur) into the high-pressure loop (DN8/DN4, max. 800 m). The indi-
vidual nebulizers are supplied from the high-pressure ring (stub, DN4, max. 4 m). Each nebulizer has a
T-connector for connecting to the stub.
6.2
General information
– Use only components that comply with the material specifications.
– The hoses of the ring line must be laid in a protective pipe.
– If the hoses are to be laid through an opening in the wall (with or without press-on fittings), the re-
spective end must be sealed during installation to prevent dirt from entering the hose.
– Do not bend the hoses tighter than the following minimum bend radii:
– DN8 hose: 115 mm
– DN4 hose: 40 mm
– The recommended distance for the high-pressure hose brackets is 1.0 m
– When pressing the fittings, the specifications in accordance with the table in
must be
observed. You must check the pressing dimensions and correct compression of each fitting. Fittings
that have been compressed incorrectly must be replaced.
CAUTION!
Damage to the hose due to incorrect installation
When laying the hoses you must ensure that they do not rub on corners, wall ducts or openings, etc. so
that the high-pressure hose does not become damaged. Please remember that the hose may expand
or contract due to differences in pressure and temperature.