12
Product overview
3.3
Equipment structure
3.3.1 TurboFogNeo 1, 2, 2x1 and 2x2
146 mm
212 mm
5
146 mm
212 mm
5
7
6
6
9
8
9
8
3
4
2
1
Figure shows TurboFogNeo 1
Figure shows TurboFogNeo 2x2
Fig. 1: Equipment structure TurboFogNeo 1, 2, 2x1 and 2x2
Key
1 2x connection for quick coupling of the
high-pressure ring line to the atomizer
2 1x connection for high-pressure supply line
from the high-pressure ring to supply the wall
bracket
3 2x connection for power supply to the nebu-
lizers
4 1x connection for the power supply of the
wall bracket
5 Three-part wall bracket for mounting and
horizontal alignment of the device.
6 2x screw connections for vertical alignment
of the device
7 Two-arm wall bracket with connections for
the electrical and hydraulic supply
8 High-pressure nozzle
9 Fan outlet opening
Содержание DRAABE HighPur
Страница 1: ...2603250 0 EN 2112 INSTALLATION AND OPERATING INSTRUCTIONS Humidification system DRAABE HighPur...
Страница 41: ...Notes...
Страница 42: ...Notes...
Страница 43: ......