2.5
Installation of On-Board Mass Storage
If an on-board mass storage option has been ordered, it will be necessary to install the option at
this time.
The mass storage option plugs into connector P2 and is secured via screws and spacers using
the four mounting holes as shown in Figure 2-4 below.
2-6
PP 110/01x
Hardware Installation
Mass Storage
Option Mounting Holes
EIDE Header P2
Mass Storage
Option Connector
Outline of Mass
Storage Option
Figure 2-4 Mass Storage Connector and Fixing Holes
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com