
100 - Advanced Functions
DeviceMaster PNIO | UP User Guide
: 2000639 Rev. A
Advanced Functions
6.
Insert a serial module to Slot 3 and configure the IO submodules, as shown in
following figure.
7.
Leave Slot 1 and Slot 2 open as they are controlled by PLC1.
8.
Double-click the DeviceMaster, on the
General tab | Shared Device
, change the
Access
option from
PLC_2
to
—
for the head module
DM4P2E
, as shown in the
following figure. This makes the PLC1 the only one that controls the head
module.
9.
Compile and download the project to PLC2.
10. Open the web page and click
Diagnostics | System Info
. If the second PLC
connection has been established successfully, the
Active Application
Relationship
should be 2, as shown in following figure.
Содержание 99531-9
Страница 1: ...PROFINET IO User Guide ...
Страница 60: ...60 Configuring a Serial Port DeviceMaster PNIO UP User Guide 2000639 Rev A Configuring a Serial Port ...
Страница 88: ...88 IO Data Handling DeviceMaster PNIO UP User Guide 2000639 Rev A IO Data Handling ...
Страница 138: ...138 Managing the DeviceMaster DeviceMaster PNIO UP User Guide 2000639 Rev A Managing the DeviceMaster ...
Страница 148: ...148 RedBoot Procedures DeviceMaster PNIO UP User Guide 2000639 Rev A RedBoot Procedures ...