RC-1170/1270 Redundancy Switch Controllers
Revision 0
Installation and Connectors
2–1
MN-RC-1170/1270
Chapter 2. INSTALLATION AND
CONNECTORS
This chapter provides the following information for the Redundancy Switch Controller:
•
Unpacking
•
Installation
•
Power connection
•
External connections
2.1
Unpack and Inspect the Shipment
This equipment contains parts and assemblies sensitive to damage by
Electrostatic Discharge (ESD). Use ESD precautionary procedures when
handling the equipment.
Inspect the shipment. Do these steps:
1. Keep all shipping materials.
2. Check the packing list to make sure the shipment is complete.
3. Inspect the equipment for damage. If damage exists, immediately
contact the carrier and CEFD to submit a damage report.
4. Read the online manual.
The RC-1170 (future)/1270 Redundancy Switch Controller and its power cord are packaged and
shipped in a reusable cardboard carton containing protective foam spacing (Figure 2-1). The
Installation and Operation Manual can be found on the CEFD website,
under the Download Manuals tab.
Do not use any cutting tool that will extend more than 1 inch (2.54 cm) into the
container and cause damage to the unit.