
8-36
HSZ70 Solutions Software V7.7 for Novell NetWare - PCI
Compaq Confidential – Need to Know Required
Writer:
Robert Young
Project:
HSZ70 Solutions Software V7.7 for Novell NetWare - PCI
Comments:
Part Number:
AA-R8JUE-TE
File Name:
i-ch8 Installing Upgrades to Your RA7000 Subsystem.doc
Last Saved On:
5/22/00 2:23 PM
Installing Additional BA370
Rack-Mountable Enclosure
Install an additional BA370 rack-mountable enclosure into your ESA10000
data center cabinet to expand storage capacity. Kits you will need to complete
an installation of a BA370 into an ESA10000 data center cabinet are the
following:
DS-BA370-AA -- The BA370 rack-mountable enclosure that includes not only
the enclosure, but also five 180 watt power supplies, eight fans, a rack
mounting kit, an EMU, and a PVA.
DS-HSZ70-AH -- The controller kit that includes not only the I/O controller
module assembly, but also two cache module assemblies, SIMM modules to
upgrade the cache modules if necessary, all necessary labels and cables along
with a ferrite bead kit for the controller to host cable, necessary hardware, and
the ECB cable installation kit.
DS-HS35X-BD -- The ECB itself.
DS-SW6XP-AA/AB -- A second 60 Hz or 50 Hz power distribution unit.
DS-BA35X-HH -- To configure a fully redundant system, three more 180
watt power supplies must be added to the BA370.
The BA370 is shipped with a rack mounting kit containing mounting rails,
which you install onto the data center cabinet’s vertical rails, and mounting
brackets, which you attach to the sides of the BA370 rack-mountable
enclosure.
You must first install the mounting rails onto the data center cabinet’s vertical
rails. Ensure proper orientation of the rails by referring to Figure 8-22 and
Figure 8-23, while visually inspecting the rails and reading the following text.
It is very important that you properly install the mounting rails onto the data
center cabinet’s vertical rails or you will not be able to install the BA370. The
front of the mounting rail has three protruding studs, with an alignment tab
approximately five inches behind the studs. The front of the mounting rail is
installed towards the front of the cabinet with the alignment tabs facing the
cabinet side panels and with the three studs protruding through designated
holes in the cabinet front vertical rails. The rear of the mounting rail has a U-
shaped flange and two screw holes, one in the U-shaped flange and one in the
mounting rail itself. The rear of the mounting rail is installed towards the rear
of the cabinet. The bottom of the mounting rail has a flange running the entire
length of the rail. The top of the mounting rail has a flange that runs most of
the length of the mounting rail from the rear of the mounting rail to
approximately two inches from the front of the mounting rail.
Содержание StorageWorks HSZ70
Страница 23: ...Unpacking and Setting Up Your RA7000 Subsystem 1 9 Figure 1 4 RA7000 subsystem major components typical...
Страница 26: ...1 12 HSZ70 Solutions Software V7 7 for Novell NetWare PCI Figure 1 5 SCSI buses...
Страница 28: ...2 2 HSZ70 Solutions Software V7 7 for Novel Netware PCI Figure 2 1 SWXA3 BD differential host adapter...
Страница 34: ......
Страница 38: ......
Страница 45: ...Installing the Command Console Client 4 7 Figure 4 4 Connect Serial dialog box...
Страница 46: ......
Страница 81: ...Creating Your Storage Configuration with the CLI 6 25 Date__________________ Name StorageSet Uses Used by...
Страница 82: ......
Страница 86: ......
Страница 102: ...8 16 HSZ70 Solutions Software V7 7 for Novell NetWare PCI Figure 8 11 Exfisting SIMMs Installed in Slots 0 and 2...
Страница 119: ...Installing Upgrades to Your RA7000 Subsystem 8 33 Figure 8 20 Expansion enclosure SCSI bus addresses...
Страница 136: ...8 50 HSZ70 Solutions Software V7 7 for Novell NetWare PCI CXO5929A Figure 8 32 N 1 power cabling...
Страница 137: ...Installing Upgrades to Your RA7000 Subsystem 8 51 CXO5797A Figure 8 33 Fully redundant power cabling...
Страница 158: ......
Страница 162: ......
Страница 168: ......