Selecting a Site
Make sure that the installation area that you select has the following features:
■
A sturdy, level installation site that includes dedicated and properly
grounded (earthed) circuits, air conditioning, and electrostatic discharge
(ESD) protection
■
7.6 cm (3.0 inches) clearance on all sides of server for proper ventilation in
a tower configuration
IMPORTANT:
See the following section, “Installing the Rack Server,” for clearance
specifications if you are installing the ProLiant ML350 Generation 2 server into a rack
configuration.
■
A separate electrical circuit for the server
CAUTION:
Protect the server from power fluctuations and temporary
interruptions with a regulating uninterruptible power supply (UPS). This device
protects the hardware from damage caused by power surges and voltage spikes
and keeps the system in operation during a power failure.
To purchase a UPS, contact your local Compaq authorized reseller or
visit the Compaq website:
www.compaq.com/showroom/
Refer to Appendix F, “Specifications,” for detailed power and environmental
site requirements.