Overview of Server Installation
2-5
Compaq Confidential – Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide Comments:
Part Number: 236843-002 File Name: c-ch2 Overview of Server Installation.doc Last Saved On: 9/4/01 10:14 AM
Locating Materials
Locate the following materials that were shipped with your ProLiant ML350
Generation 2 server:
■
Keyboard (not included with the rack model)
■
Mouse (not included with the rack model)
■
Power cord
■
Documentation and software packs inside the shipping box
In addition to these supplied items, you may need:
■
Torx T-15 screwdriver
■
Phillips #2 screwdriver
■
Hardware options
■
Ethernet cable
■
Operating system or application software
■
Uninterruptible power supply (UPS)
■
Monitor