![CommScope ION-U EU H 7P/80-85P/17EP/19P DC Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/commscope/ion-u-eu-h-7p-80-85p-17ep-19p-dc/ion-u-eu-h-7p-80-85p-17ep-19p-dc_manual_2643787043.webp)
4. Commissioning
User’s Manual for ION
®
-U Page
43
4.3.15.1. Assemble optical Opus short plug components
The following instructions cover both simplex and duplex fiber cables. Steps that
apply only to duplex cables have “b” following the step number.
Unscrew the nut and take out the plug clamp. Slide the adaptor nut
and the
clamp
onto and along the fiber patch cable as shown.
figure 4-23 Opus short plug clamp and nut
Simplex Cable
Duplex Cable
Place the simplex split gasket
on
the cable using the split on the side of
the gasket with the larger diameter of
the gasket toward the front.
Place the duplex split gasket
on the
cables using the split on both sides of
the gasket with the larger diameter of the
gasket toward the front. Ensure that the
channel positioning is correct as shown.
figure 4-24 Simplex split gasket
figure 4-25 Duplex split gasket
1
2
3
4
1
2
2b
Flat surface
Channel B
Channel A
Flat surface
Содержание ION-U EU H 7P/80-85P/17EP/19P DC
Страница 1: ...ION U H 7P 80 85P 17 E P 19P Remote Unit Manual MF0200A8D ...
Страница 47: ...4 Commissioning User s Manual for ION U Page 47 4 4 Commissioning Flow Chart PE 1 2 3 ...
Страница 48: ...4 Commissioning Page 48 User s Manual for ION U ...
Страница 57: ......