background image

ADCP-90-516 • Rev B • April 2019

Page 8

© 2019, CommScope, Inc.

Figure 5. FL2000 Storage Panel 5-Inch Recess Rack Mounting Option (Top View)

4. Align the left side mounting bracket holes to the corresponding holes in the rack and

secure the panel to the rack using #12-24 screws (provided). 

5. Align the mounting holes in the right side of the panel with the corresponding holes in the

rack, and secure the panel to the rack using # 12-24 screws (provided).

3.1.2

Flush, 1-, 2- or 4-Inch Recess Mount in a 19-Inch Rack

1. Remove the front cover of the storage panel by opening the cover approximately two

inches (5 cm), then lifting the cover from the hinges (see 

Figure 1

).

2. Remove the VCG from the left side of the storage panel and install the 

narrower

 VCG

from the optional flush mount kit. 

3. Attach the adjustable mounting bracket to the side of the VCG, positioned either at the

front (for flush mounting), or one or two inches back depending on the recess required.
(See items shown in dashed lines at the left side of 

Figure 6

.)

4. Attach the chassis mounting bracket (from the optional Flush Mount Kit) to the right side

of the storage panel with the same amount of recess as the mounting bracket attached in

Step 3

. (See right side of 

Figure 6

.)

5. The storage panel must be positioned on the equipment rack so any cross-connect or fiber

optic terminal (FOT) patch cords can enter the storage panel through the VCG at the left
side of the storage panel (see 

Figure 1

). 

Note: 

To attach the storage panel flush, or with a one-inch, two-inch, or four-inch recess

from the front of the equipment rack, you will need the FL2000 Flush Mount Kit.

5 IN.

RECESS

5 IN.

RECESS

EQUIPMENT

RACK

EQUIPMENT

RACK

17108-A

Содержание FL2000 Storage Panel

Страница 1: ...Recess Rack Mount Installation in a 19 Inch Rack 7 3 1 2 Flush 1 2 or 4 Inch Recess Mount in a 19 Inch Rack 8 3 1 3 19 Inch Maximum Mounting 9 3 1 4 23 Inch Rack Mount With Wide VCG 10 3 1 5 23 Inch Centered Rack Mount With Extender Brackets 11 3 2 FL2000 Storage Panel ETSI Flush Mount Kit 12 3 3 Wall Mount Installation 13 4 INSTALLING STORAGE PANEL COMPONENTS 14 4 1 Designation Labels 14 4 2 Key ...

Страница 2: ...allation Instructions ADCP 90 224 FL2000 Termination Splice Panels USer Manual ADCP 90 522 Admonishments Important safety admonishments are used throughout this manual to warn of possible hazards to persons or equipment An admonishment identifies a possible hazard and then explains what may happen if the hazard is not avoided The admonishments in the form of Dangers Warnings and Cautions must be f...

Страница 3: ... Each storage deck has four spools for cable storage one pair of spools for each of two cables Depending on the length of the cable either a Figure 8 or an oval method is used to store the cable on two spools Warning Warning is used to indicate the presence of a hazard that can cause severe personal injury death or substantial property damage if the hazard is not avoided Caution Caution is used to...

Страница 4: ...23 cm high A sixteen disk panel is shown in Figure 2 The fiber storage disk assemblies provide storage space for the patch cords Each disk provides 2 3 to 12 5 feet 0 7 3 8 meters of storage capacity and will accommodate one 2 or 3mm patch cord The storage disk assemblies easily slide out of the chassis from the front to provide convenient access for storing patch cords Patch cords enter and exit ...

Страница 5: ... Components 16 Disk Panel Shown Figure 3 Typical Storage Tray Panel Components CHASSIS MOUNTING BRACKET VERTICAL CABLE GUIDE VCG FANNING STRIP REMOVABLE FRONT COVER TURN PULL LATCH STORAGE DISK 18900 A CHASSIS MOUNTING BRACKET VERTICAL CABLE GUIDE VCG TURN PULL LATCH DESIGNATION CARD 18901 A ...

Страница 6: ...rom the left side to provide convenient access for storing patch cords Patch cords enter and exit each tray assembly from an opening on the edge of the assembly 1 4 Horizontal Management Panel The horizontal management panel has two spools to store patch cords The panel is 5 25 inches 13 34mm high A horizontal management panel is shown in Figure 4 Up to 137m 550 feet of slack cable can be stored u...

Страница 7: ...escribes installation of the storage panel in an equipment rack The storage panel is shipped from the factory set up for 5 inch 12 7 cm rack recess The optional flush mount kit must be installed if a flush 1 2 or 4 inch 2 54 5 08 or 10 16 cm rack recess is required in a 19 inch rack Using the flush mount kit and the 23 inch extender brackets the storage panel can be flush mounted in a 23 inch rack...

Страница 8: ...G from the optional flush mount kit 3 Attach the adjustable mounting bracket to the side of the VCG positioned either at the front for flush mounting or one or two inches back depending on the recess required See items shown in dashed lines at the left side of Figure 6 4 Attach the chassis mounting bracket from the optional Flush Mount Kit to the right side of the storage panel with the same amoun...

Страница 9: ... then lifting the cover from the hinges 2 Unlatch and open the bulkhead panel 3 Remove the VCG from the left side of the panel and in its place install the VCG provided with the kit 4 Position the panel on the rack 5 Align the VCG mounting holes to the corresponding holes in the rack and secure the panel to the rack using 12 24 screws provided 6 Align the mounting holes in the right side of the pa...

Страница 10: ...h Wide VCG The FL2000 23 inch VCG Kit not provided is used to install the panel in a 23 inch rack with a wide VCG Figure 8 shows the panel and kit components Figure 8 FL2000 23 Inch Rack Mount With Wide VCG Top View 5 IN RECESS 5 IN RECESS EQUIPMENT RACK EQUIPMENT RACK 17260 A 5 IN RECESS 5 IN RECESS EQUIPMENT RACK EQUIPMENT RACK 17108 A ...

Страница 11: ...e rack and secure the panel to the rack using 12 24 screws provided 3 1 5 23 Inch Centered Rack Mount With Extender Brackets The FL2000 23 Inch Centered Rack Mount Kit not provided is used to center mount the panel on a 23 inch rack Using a Flush Mount Kit the panel can be mounted flush 1 2 or 4 inch position Figure 9 shows the panel and kit components Figure 9 FL2000 23 Inch Centered Mounting Top...

Страница 12: ...o install the panel in a rack To install a storage panel in an ETSI rack remove the VCG base from the left side of the panel and replace it with the ETSI Flush Mount VCG base See Figure 10 Attach the right side bracket using 4 40 screws as shown in Figure 10 Before installing the panel in the rack an M6 1 cage nut must be installed in each rack mounting hole position Attach the panel to the rack w...

Страница 13: ...eight of the plywood panel the storage panel and any other equipment attached to the plywood If attaching the storage panel directly to a wall ensure that the selected fasteners can support the weight of the storage panel Install the storage panel as follows 1 Remove the storage panel front cover by opening the cover approximately two inches 5 cm then lifting the cover from the hinges see Figure 1...

Страница 14: ...G STORAGE PANEL COMPONENTS Supplied storage panel components include designation labels bulkhead panel labels and hole plugs Optional components for the storage panel include a key lock and cable clamp kit 4 1 Designation Labels Number labels are included with the storage panel for identifying on the label inside the front cover all the storage loops installed in the module 4 2 Key Lock The front ...

Страница 15: ...e the cable to the inner tie point i e closest to the spools 4 Next route the cable toward the front left corner of the storage deck and out into the vertical cable guide adjust the cable slack as necessary to ensure that no pinching or binding will occur when the storage deck is returned to its normal position in the storage panel 5 Store the second cable on the pair of spools on the right side o...

Страница 16: ...s Internal stops will prevent the disk assembly form sliding completely out of the chassis 5 Find the midpoint of the excess patch cord slack and form a loop 6 Place loop around one of the two retainers that are mounted in the center of the storage disk 7 Route the two patch cord segments around the second retainer and out through the opening in the edge of the disk assembly as shown in Figure 13 ...

Страница 17: ...procedure for each patch cord to be stored Close front cover when complete 14 When opening a storage disk assembly that is storing a patch cord rotate disk assembly to feed out slack as disk assembly is withdrawn from the chassis 5 3 Using the Storage Tray Panel Use the following procedure to store excess patch cord length in a Storage Tray Panel 1 Adjust patch cord slack so that excess length is ...

Страница 18: ...gh the tray channels working your way to the center circle until all excess pigtail length is stored 8 As the slack is used up allow enough to route the pigtail out of the tray to the original entry point 9 Route the pigtail out of tray through the opening near the tray hinge 10 Apply numbered identification labels provided to each pigtail and mark cable designations on front of cable management t...

Страница 19: ... and out into the vertical cable guide adjust cable slack as necessary to ensure that no pinching or binding occurs 3 Store the second cable on the pair of spools at the front of the storage panel when it exits the spools route it through the cable guide at the back of the panel 4 Complete a designation label for the stored patch cord and apply label to front edge of management panel assembly 5 Re...

Страница 20: ...STANCE For technical assistance or to report a missing or damaged part contact CommScope online at http www commscope com SupportCenter For information on product patents refer to http www cs pat com For other information on CommScope products use http www commscope com ...

Отзывы: