16
4.2.21 Insert the strength member into the strength member connector
and tighten the screw.
4.2.22 Insert the fibers and loose tube(s) into the FOPT-CS.
4.2.23 Apply foam tape at the tie wrap positions. Install the prepared
cable(s) on the side termination plate.
4.3
Cable entrance at the back of the shelf
a) Loose tube cable
4.3.1 In case of 19” and ETSI, remove two tie-wraps at the bottom of
the tray. Do not remove tie-wraps in case of 15”.
4.3.2 In case of strength member termination in the rack (use
FIST-GSS2-CT-BR-2): mount the flex tube holder and the plastic
stand-off n case of 19” and ETSI. In case of 15” there is no stand-off
needed. Mount the tubes to the black stand-off with a tie wrap. Protect
the tubes with the spiral tubing and make sure the bend is smooth.
Terminate as shown (for details see similar side termination).
4.3.3 In case of a second cable, replace the releasable tie wrap by
a stand-off.
=
=