2
Kit content: example: FIST-GSS2-MA
• 1 shelf, incorporating
- Metal chassis with drawer
- Hingable and removable front cover
- Pre-mounted tubes
- Pre-mounted FAS block + cover
• 1 pigtail horn
• 1 tray lid + fiber guiding pin
• 1 cable entrance kit for 2 loose tube cables
• Cage nuts + bolts
• Mounting br screws
• FOPT CT transportation tubing
• Installation instruction
2 General
2.1
Kit content
2.2
Tools
• FACC-ALLEN-KEY-5-350
to mount shelf in the rack
• FACC-CAGE-NUT-TOOL
for easy installation of cage nuts
in the rack
• FACC-TUBE-CUTTER-01
cutter for transportation tubes
• FACC-TUBE-STRIPPER-02
loose tube stripper
• FACC-FIBRE-FEEDER
• Marker pen
3.1
Install the mounting brackets on the correct position.
GR mounting is shown.
3 Installation of the shelf
3.1 Mounting the shelf in the rack
3.1.2 Determine the position of the shelf (see rack installation
instruction). Fix the cage nuts into the rack mounting uprights.