
10
VENT DAMPER INSTALLATION
Vent Damper Installation
Note: Refer To Figure 5 Below For Steps 1-7
1.
Place Vent Damper on or as close to vent outlet of
boiler as possible. Do not modify vent damper.
2.
Remove Locknut from connector at the free end
of the Damper wire harness.
3.
Feed Damper connector and Damper wire harness
through bracket hole on Damper Motor frame.
4.
Replace and tighten locknut onto Damper wire
harness connector.
5.
Plug Damper connector into socket on Damper
Motor frame.
6.
Ensure that only the boiler is serviced by the Vent
Damper. See
fi
gure 6.
Figure 5 - Standard Vent Damper Installation
Figure 6 - Alternate Vent Damper Installation
7.
Clearance of not less than 6 inches between
Vent Damper and combustible construction must
be maintained. Additional clearance should be
allowed for service of the Vent Damper.
8.
Vent Damper must be in open position when
appliance main burners are operating.
9.
The Vent Damper position indicator must be in a
visible location following installation.
10.
The thermostats heat anticipator must be
adjusted to match the total current draw of
all controls associated with the boiler during a
heating cycle.
11.
The Vent Damper wire harness may be removed
and installed in
fl
exible metal conduit if local
codes or jurisdiction requires. If this is necessary,
the
fl
exible metal conduit must be mounted to
a J-box and all appropriate connections must be
made to this J-box.
Содержание CEG-C
Страница 30: ...30 INSTALLATION NOTES ...
Страница 31: ...31 INSTALLATION NOTES ...
Страница 32: ...COLUMBIA COMPANY Main offices and factory Pottstown PA ...