7.1. Transport and Packing
»
Please ensure adequate carrying capacity of the lifting equipment.
Note that the dryer system is top-heavy. Risc of toppling!
The equipment pass a rigorous operating test in the factory and are packed carefully to avoid
transport damage.
Please check packing on delivery for transport damage.
The inlet and discharge flanges are sealed with plugs, so that no dirt can enter during transport.
Plugs must be removed before assembly.
Packing materials should be disposed of according to environmental laws or reused.
Only use for transport of the equipment a suitable lifting device (e. g. a fork lift truck or a workshop
crane).
Fasten the transport cables to the eyelets of the control cabinets.
Transport must be shock-proofed and free from vibrations.
with a fork lift truck
Push the forks up to the dryer housing.
Check that the forks reach completely under the dryer housing.
64.10-8248GB01
04/02
Dehumidified Air Dryer
Transport, Assembly and Storage 7-2
Transport with a fork lift truck
Содержание CTT 1200
Страница 81: ...Dehumidified Air Dryer Accessories 12 2...
Страница 82: ...64 10 0134GB01 10 97 Dehumidified Air Dryer Accessories 12 3...
Страница 83: ...Accessories Entering values on the OP 7 17 Colortronic GmbH 02 01GB...
Страница 89: ...Accessories Flap control with Fuzzy Logic Colortronic GmbH 10 00GB...
Страница 91: ...Accessories Spare parts list Drying Hoppers TT 25 TT 6400 GB01 01 03 Colortronic GmbH...
Страница 94: ...GB01 01 03 TT 25 TT 6400 4 15 D 9 10 11 12 13 14 PT 100 1 2 3 4 5 6 7 17 16 8 18 PT 100 A C B...