
Instructions to assemble and install
Edition E0
Page 59 of 69
Confidential and Property of CoeLux S.r.l.
The installer is always responsible for fastening the 45 HC systems to the existing structure. It
must be carried out by specialised personnel, who comply with the safety measures in force in
the place of installation.
Fig. 60
Suspension system for tilted dark-box
The suspension system shown here (Figure 60) has been certified by a structural engineer and is
entirely t
he installer’s responsibility. CoeLux does NOT supply this suspension system.
CAUTION:
If you do not use the CoeLux suspension kit, the installer will be responsible for the structural
certification of the new suspension system. CoeLux S.r.l. declines any liability for the use of any
alternative suspension system to the one offered.
Application of a 12 mm -thick metal
plate between the angle profile and
the tie rod plate to fasten the tie rod
Tilted threaded bars
Threaded vertical support bars with end
welded to special elements
Tightening screw
50x30x5 angle profile
Insert a 12 mm shim between
the angle profile and the tie rod
plate (Close-up D1)
100x100x6 double L profile
placed vertically compared to
the dark-box.
100x100x6 double L profile
placed horizontally compared
to the dark-box.
100x6 angle bar fastened to the
ceiling with a minimum of 2
M12 plugs (8.8)
Insert a 6 mm shim between the
longitudinal angle profile (100x100x6)
and the angle profile (50x30x5) (Close-
up D2).