Technical Manual
CODEL
25
6.2.1.2. Remove ribbon cable.
6.2.1.3. Remove the four screws from the four corners of the E-Cell. Ensure that these are kept
safe.
6.2.1.4. Slowly remove the E-Cell from the Unit.
6.2.1.5. Insert the new E-Cell in to the unit and screw back in to place.
6.2.1.6. Following this procedure, a calibration must be carried out, follow the steps from section
6.1.1. to section 6.1.4.6. to calibrate.
Note: Failure to replace cells will invalidate the warranty and performance of the analysers after this
time cannot be guaranteed.
Electrochemical Cell
Содержание Tunnel Tech 700 Series
Страница 2: ...Issue A Rev 0 Date 25 04 17 Ref 100303...
Страница 3: ...CODEL Issue A Rev 0 Date 25 04 17 Ref 100303...
Страница 5: ...CODEL Issue A Rev 0 Date 25 04 17 Ref 100303...
Страница 6: ......
Страница 10: ...Technical Manual CODEL Issue A Rev 0 Date 25 04 17 Ref 100303...
Страница 21: ...Technical Manual CODEL 11 Figure 7 Electrical Schematic...
Страница 23: ...Technical Manual CODEL 13 Power Control Display PCB Electrochemical Cell PCB Communications...
Страница 24: ...Technical Manual CODEL 14 Visibility PCB Ma Output PCB S Top mA RLY 4 5 Bottom mA RLY 1 2...
Страница 37: ...Technical Manual CODEL 27 Alignment Laser Please Call CODEL mA Relay Card 803 604D...
Страница 79: ......
Страница 80: ......
Страница 81: ...Technical Manual Page 1 CODEL...