Section 4
Commissioning
Issue: A Revision: 1 Date: 24/07/19 Ref: 100606
Page: 49
Connect the voltmeter to the S0V and S1 test points, as in figure 19. A voltage of
4Vrms is the target. Increase the gain using the trim pot at the END DETECTOR,
until the voltage is a maximum of 4Vrms.
Repeat the above procedure for the SIDE DETECTOR, measuring across S0V and
S2 test point.
When the detector levels are satisfactory, replace the cover.
After the detector level(s) at the receiver have been optimised if necessary, the
levels within the micro-processor should be adjusted. This adjustment is
conducted by means of two trim potentiometers within the signal processor -–
see Figure 15.
4.6.2
Signal Processor
Gain Adjustment
Figure 15 : Gain Adjustment Signal
Processor
If the duct is operating and a high opacity may be present, reduce the set voltages to 2Vrms maximum. This is to
prevent saturation should the opacity level drop.
NOTE
Содержание Energy Tech 401
Страница 71: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 71 ...
Страница 99: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 99 ...
Страница 101: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 101 ...
Страница 115: ...Section 6 Maintenance Issue A Revision 1 Date 24 07 19 Ref 100606 Page 115 Corrective Maintenance ...
Страница 118: ...Page 118 EnergyTech 401 CODEL Operating and Maintenance Manual Monitoring Solutions ...