9
DECrepeater 90TS Installation and Configuration
Installing the Module (Cont.)
4
Verify that the module’s Power
LED lights immediately and
that the Module OK
LED lights
within 1 minute
a. The Power
LED lights when
power is applied, then the mod-
ule performs a self-test.
b. After the module completes the
self-test, the Module OK
LED lights and remains lit.
NOTE:
If the LEDs do not operate as described, refer to the
section titled Problem Solving Using the LEDs .
Go to the section titled Connecting the UTP/STP Cables, on page 15.
LKG–9145-94I