Setting the Waterfall
For standard pool applications, the waterfall must be installed before the deck and coping. Place the
waterfall in the notch cut in the bond beam or wall application. Utilize substrate material such as tile, thinset
or mortar to make sure that the waterfall is level with the top of the upper edge of the bond beam. Fill the
gaps around the unit and coat the face of the waterfall with concrete or similar material in preparation for
the tiles or other material. Cut the tile/material to fit under the lip of the waterfall using thinset or similar
substance to secure in place. Make sure to leave about 1/8” overhang of the waterfall face, after the tiles has
been installed (Figure 5 & 6). Ensure the waterfall is level front to back and across the length of the fall.
Complete the electrical installation and plumbing before covering the top deck.
Figure 5: Waterfall flow edge overhang – Shown with tile
When installing the final facia to the waterfall whether using tile, stone or other substrate, do not cover the
access doors. These will be required for servicing the unit.
Figure 6: Installation of the waterfall unit.
.
WATERFALL
Leave about 1/8” overhang
after tiles are installed
TILE
CONCRETE
Do not cover access doors with tile, stone, or any substrate.