Start-up report
To detect the objective operational conditions is useful to control
the unit over time.
With unit at steady state, i.e. in stable and close-to-work
conditions, identify the following data:
total voltages and absorptions with unit at full load
absorptions of the different electric loads (compressors, fans,
pumps etc)
temperatures and flows of the different fluids (water, air) both
in input and in output from the unit
temperatures and pressures in the feature points of the
cooling circuit (compressor, liquid, suction drain/unload)
The detections must be kept and made available during
maintenance interventions.
Directive 2014/68EU PED
Directive 2014/68EU PED also sets out the regulations for unit
installers, users and maintenance operators.
Refer to local regulations; briefly and as an example, see the
following:
Compulsory verification of the first installation:
only for units assembled on the installer's building site (for ex.
condensing c direct expansion unit)
Commissioning declaration:
for all units
Periodical checks:
to be executed with the frequency indicated by the
Manufacturer (see the “maintenance inspections” paragraph)
6 START-UP
Содержание R513A
Страница 1: ...R513A MANUAL FOR INSTALLATION USE AND MAINTENANCE WDAT ik4 120 1 580 2 MF500002 00 11 20...
Страница 20: ...20 5 ELECTRICAL CONNECTIONS...
Страница 34: ...34 7 CONTROL...
Страница 35: ...35 7 CONTROL...
Страница 36: ...36 7 CONTROL...
Страница 37: ...37 7 CONTROL...
Страница 51: ...51 9 ANTIVIBRATION MOUNTS Anti vibration mount support Anti seismic spring antivibration mounts...
Страница 52: ...52 9 ANTIVIBRATION MOUNTS...
Страница 53: ...53 9 ANTIVIBRATION MOUNTS...
Страница 73: ......