P/N 97475, Rev. 2
Page 5
1.6
R
ISK
ASSESSMENT
CHECKLIST
The following checklist is not intended to be an all inclusive list of things to watch
out for when setting up and operating this. However, these checklists are typical of
the types of risks the assembler and operator should consider. Use these checklists
as part of your risk assessment:
T
ABLE
1-2. R
ISK
ASSESSMENT
CHECKLIST
BEFORE
SET
-
UP
Before set-up
I took note of all the warning labels on the machine.
I removed or mitigated all identified risks (such as tripping, cutting, crushing, entan-
glement, shearing, or falling objects).
I considered the need for personnel safety guarding and installed any necessary
guards.
I read the machine assembly instructions (Section 3) and took inventory of all the
items required but not supplied (Section 3).
I created a lift plan, including identifying the proper rigging, for each of the setup
lifts required during the setup of the support structure and machine.
I located the fall paths involved in lifting and rigging operations. I have taken pre-
cautions to keep workers away from the identified fall path.
I considered how this machine operates and identified the best placement for the
controls, cabling, and the operator.
I evaluated and mitigated any other potential risks specific to my work area.
T
ABLE
1-3. R
ISK
ASSESSMENT
CHECKLIST
AFTER
SET
-
UP
After set-up
I checked that the machine is safely installed (according to Section 3) and the
potential fall path is clear. If the machine is installed at an elevated position, I
checked that the machine is safeguarded against falling.
I identified all possible pinch points, such as those caused by rotating parts, and
informed the affected personnel.
I planned for containment of any chips or swarf produced by the machine.
I followed the required maintenance checklist (Section 5.1) with the recommended
lubricants (Section 5.2).
I checked that all affected personnel have the recommended personal protective
equipment, as well as any site-required or regulatory equipment.
I checked that all affected personnel understand and are clear of the danger zone.
I evaluated and mitigated any other potential risks specific to my work area.
Содержание SHARK FIN DEFENDER
Страница 2: ......
Страница 4: ...Page B Defender Clamshell Operating Manual CLIMAX GLOBAL LOCATIONS...
Страница 10: ...Page iv Defender Clamshell Operating Manual This page intentionally left blank...
Страница 12: ...Page vi Defender Clamshell Operating Manual This page intentionally left blank...
Страница 40: ...Page 28 Defender Clamshell Operating Manual This page intentionally left blank...
Страница 56: ...Page 44 Defender Clamshell Operating Manual This page intentionally left blank...
Страница 58: ...Page 46 Defender Clamshell Operating Manual This page intentionally left blank...
Страница 59: ...P N 97475 Rev 2 Page 47 APPENDIX C SDS Contact CLIMAX for the current Safety Data Sheets...
Страница 60: ...Page 48 Defender Clamshell Operating Manual This page intentionally left blank...
Страница 61: ......
Страница 62: ......