P/N 91025, Rev. 4
Page 41
4
OPERATION
IN THIS CHAPTER:
4.1 P
RE
-
OPERATION
CHECKS
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -41
4.2 M
ACHINING
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -42
4.3 A
DJUSTING
THE
MACHINE
WHEN
THE
CUT
IS
COMPLETED
- - - - - - - - - - - - - - - - - - - - - - - -43
4.4 D
ISASSEMBLY
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -44
4.1
P
RE
-
OPERATION
CHECKS
Do not operate this machine without adequate training to fully understand safe
setup, operation, and maintenance.
WARNING
Rotating machinery can cause serious injuries. Turn off and lock out the
machine before making the pre-start checks.
The FF5300 often is used in dangerous locations (in elevated positions, near other
operating equipment, overhead, etc.). CLIMAX cannot foresee where this machine
will be used; therefore, you must perform a site-specific risk assessment
(Section 1.5 on page 4) for each job before starting work.
The FF5300 machine has remote operation features that enable you to choose the
optimum location to work from.
WARNING
Always follow safe work practices, including site-specific safety
requirements. It is your responsibility to perform a risk assessment
before you set up the machine and each time before you operate the
machine.
Do the following checks before operating the machine:
1. Complete the risk assessment checklist in Table 1-3 on page 5.
2. Check that all preventative maintenance is complete (Section 5) and the
drip rate is set correctly on the pneumatic conditioning unit (PCU). Refer to
Section 5.4.1 on page 49.
3. All energy supplies are off and the emergency reset button is released.
4. Check that the work area is clear of non-essential personnel and equipment.
5. Check that the machine control/observation area will not be in the path of
hot flying chips during machine operation.
6. Check the machine is securely mounted to the workpiece.
Содержание FF5300
Страница 1: ...FF5300 FLANGE FACER FF5300 OPERATING MANUAL ORIGINAL INSTRUCTIONS P N 91025 June 2019 Revision 4...
Страница 2: ......
Страница 4: ...Page B FF5300 Operating Manual CLIMAX GLOBAL LOCATIONS...
Страница 5: ...P N 91025 Rev 4 Page C CE DOCUMENTATION...
Страница 12: ...Page vi FF5300 Operating Manual This page intentionally left blank...
Страница 20: ...Page 8 FF5300 Operating Manual This page intentionally left blank...
Страница 52: ...Page 40 FF5300 Operating Manual This page intentionally left blank...
Страница 68: ...Page 56 FF5300 Operating Manual FIGURE A 1 FF5300 ASSEMBLY P N 89900...
Страница 69: ...P N 91025 Rev 4 Page 57 FIGURE A 2 FF5300 ASSEMBLY DETAIL P N 89900 7 7...
Страница 72: ...Page 60 FF5300 Operating Manual FIGURE A 5 MACHINING ARM ASSEMBLY P N 90337...
Страница 74: ...Page 62 FF5300 Operating Manual FIGURE A 7 TOOL HOLDER ASSEMBLY P N 89940...
Страница 83: ...P N 91025 Rev 4 Page 71 APPENDIX B SDS Safety Data Sheets are available upon request...
Страница 84: ...Page 72 FF5300 Operating Manual This page intentionally left blank...
Страница 85: ......
Страница 86: ......