SEQUENCE OF OPERATIONS 

24CGP10 

Mechanical Timer 

 

 

1.

 

To turn the unit on, depress the red on/off rocker switch. 

 

115 VAC is sent to normally open blowdown valve closing it. 

 

115 VAC is sent to the Timed/Manual switches for the cabinets.  

 

115 VAC is sent to L1 and L2 of the water level board. 

 

2.

 

With the water level board energized and no water in the boiler  

 

115 VAC is sent from the IND terminal to the low water indicator light on the console. 

 

115 VAC is sent from the WF terminal to the fill solenoid after a 5-second delay. 

 

The fill solenoid opens and the boiler fills.  

 

The  water  fills  to  the  secondary  low  water  cutoff  probe  in  the  boiler,  shorting  it  to 

ground 

 

115 VAC is removed from the IND terminal and the low water indicator light is 

de-energized. 

 

115 VAC is sent from the HTR terminal through the normally closed contact of 

the high-pressure switch to the amber reset switch, 

 

115 VAC is sent through the normally closed R1 contacts to energize the amber 

light. 

 

If  the  low  water  cut  off  probe  is  not  grounded  for  20  seconds,  115  VAC  is 

removed from HTR and sent back to IND energizing the low water light. 

 

3.

 

When the momentary amber switch is depressed 115 VAC is sent to the R1 relay closing it. 

 

The normally closed R1 contacts open de-energizing the amber light.  

 

The relay latches through the normally closed contacts of R1  

 

If either the high-pressure switch (set at 15 PSI) or the low probe circuit on the 

water level board opens, then the latch circuit opens. 

 

When the water level or pressure returns to a safe condition the amber light will 

energize and the process may begin again.  

4.

 

The  R1  relay  contacts  close  sending  115  VAC  through  the  normally  closed  operating 

pressure switch to the 24 VAC transformer. 

 

24VAC is sent through the low water cutoff float switch to the R2 relay coil. 

 

The normally open R2 contacts close and send 115 VAC to the fan. 

 

The fan turns and the air prover switch is closed. 

 

24 VAC is sent through the air prover switch to the ignition module. 

 

With 24 VAC to the ignition module 24VAC is sent to the pilot coil on the gas 

valve. 

 

A spark is generated at the igniter. 

 

The pilot valve is energized and opens. 

 

Gas is sent to the pilot burner. 

 

The gas is ignited and the flame rectifies the AC current. 

Содержание SteamCraft Power 10

Страница 1: ...technical and technological changes revisions or updates Cleveland Range LLC assumes no liability or responsibility regarding errata changes revisions or updates Qualified Cleveland Range LLC Authoriz...

Страница 2: ...Cleveland Range LLC 1333 East 179th St Cleveland Ohio U S A 44110 Ph 1 216 481 4900 Fx 1 216 481 3782 Visit our Web Site at www clevelandrange com...

Страница 3: ...ounded for 20 seconds 115 VAC is removed from HTR and sent back to IND energizing the low water light 3 When the momentary amber switch is depressed 115 VAC is sent to the R1 relay closing it The norm...

Страница 4: ...mer begins to count down 115 VAC is sent to the condensate solenoid and cold water is sent to the condensate spray nozzle pulling the steam down the drain When the steam pressure drops below the opera...

Страница 5: ...ized and the heat process begins again 11 The unit is turned off by depressing the red rocker switch 115 VAC is removed from the timing and heat circuits 115 VAC is removed from the normally open blow...

Страница 6: ......

Страница 7: ......

Страница 8: ...closed R1 contacts to energize the amber light If the low water cut off probe is not grounded for 20 seconds 115 VAC is removed from HTR and sent back to IND energizing the low water light 3 When the...

Страница 9: ...cted around the product and pulled down the drain by the condensate spray When the cooking compartment reaches 193 degrees internally the thermal switch closes and the timer begins to count down 115 V...

Страница 10: ...ing the steam down the drain 11 The unit is turned off by depressing the red rocker switch 115 VAC is removed from the timing and heat circuits 115 VAC is removed from the normally open blowdown valve...

Страница 11: ......

Страница 12: ......

Страница 13: ...es the Amber light go off With the High Limit pressure switch temporarily bypassed does the Amber light go off when the reset switch is depressed No Yes No Replace the high limit pressure switch Repla...

Страница 14: ...solenoid Replace the fill solenoid Yes Is water leaving the fill solenoid Replace wiring to drain solenoid Does the steamer have the optional intermittent blowdown timer Replace the wiring to the int...

Страница 15: ...terminal is there 1 0 micro amp DC to the ignition module No Is there flame at the pilot assy Yes Yes No Replace pilot assy and ignition wire Yes Yes Replace the pilot assy and ignition wire No Boile...

Страница 16: ...t See Boiler won t ignite Yes Is the low water indicator on 120 VAC bewtween the IND and L2 terminals on the waterboard Clean or replace the low water probe Is high pressure switch opening prematurely...

Страница 17: ...eam leaks around the door Steam Leaks Around Door Is COLD water supplied to the steamer Supply cold water 35 60 PSI to the steamer No Is the door gasket physically damaged Yes Turn over the gasket or...

Страница 18: ...1333 East 179th Street Cleveland Ohio 44110 Phone 216 481 4900 Fax 216 481 3782...

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Отзывы: