Installation Guide_PV-ezRack_SolarTerraceIII-A_AU_V2.0
1/10 Duerdin Street, Clayton VIC 3168 Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
23
page
of 28
Installation Instruction
Step 5 Repeat the above steps to install all PV
Modules. Fasten all the End and Inter Clamps
tightly with18~20N.m until all the PV Modules are
correctly installed.
Solution 2 (Apply Universal Clamps)
Step1 Twisting the head of the Universal Clamp
changes the functionality from end to inter clamp
as shown in figure 23.
NOTE: Please ensure the Universal Clamp C-U/30/46 or Universal Clamp with Grounding clip
C-U/30/46-G is positioned correctly according to 5.3.1: Deployment of Grounding clip.
Step 2 Incline the Universal Clamp to place the channel on its lower part against the lower channel
of the T Rail.Then press the Universal Clamp down towards the other side of the T Rail to engage the
channel on its upper part against the upper channel of T Rail as shown in Figure24.
Note: before installation, make sure there will be enough clearance between the screw and module of
Universal Clamp as shown in Figure 24.
Fig. 24
90
°
Fig. 23