Installation Guide_PV-ezRack_SolarTerraceIII-A_AU_V2.0
1/10 Duerdin Street, Clayton VIC 3168 Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
16
page
of 28
Installation Instruction
Solution 2 (For 20 degree tilt support)
Step 1:
Unfold the pre-assembled support as shown in
Fig.7 and 8;
Step 2:
Unlock the M12*100 bolts from H Joint first and
fasten the Al-Tube and H Joint lightly with M12*100
again as shown in Fig.8;
Step 3:
Rotate the L-anchorand U-anchor plates to ensure
they align as shown as Fig.10.
Note:The bolt heads have to be kept in same
direction.
Fig. 7
Fig. 6
Fig. 8
Fig.9
Fig. 10
To achieve the earthing/
grounding function, fasten
the M8 nut within18-20
N·m
To achieve the earthing/
grounding function, fasten
the M8*40 bolt within 13-
14 N·m