4.5.1 Tilt the Inter Clamps
with W-module into the
channel of the Rail as
shown in Figure 14.
4.5.2 It is suggested to
install PV-Module from the
left side, and use the End
Clamp and Inter Clamp to
fix it.
Stretch a String as a
reference to align PV-
Module. Adjust the PV-
Modules to make their
outside faces are in a line
in
both
portrait
and
landscape orientation.
Recommended Torque:
M8: 13~14N•m
Figure 14
Figure 15
Ensure the PV modules aligned in both horizontal
and vertical directions