background image

 

                                                                      

 

15

 / 

16

                                                                          

 
 

Clenergy China    

 

 

 

     

              Tel86 592 311 0088 

999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone 

 

 

Fac86 592 599 5028 

Xiang'an District 361101, Xiamen, Fujian, China 

 

 

[email protected] 

 

4.5.1 Tilt  the  Inter  Clamps 
with  W-module  into  the 
channel  of  the  Rail  as 
shown in Figure 14. 
 

 
 
 
 
 
 
 
 
 

4.5.2  It  is  suggested  to 
install PV-Module from the 
left  side,  and  use  the  End 
Clamp  and  Inter  Clamp  to 
fix it.

 Stretch a String as a 

reference  to  align  PV-
Module.  Adjust  the  PV-
Modules  to  make  their 
outside  faces are  in  a line 
in 

both 

portrait 

and 

landscape orientation. 

 

 
Recommended Torque:  
M8: 13~14N•m

 

 
 
 

 

 

 

  Figure 14 

 

 

 

 

Figure 15 

Ensure the PV modules aligned in both horizontal 
and vertical directions 
 

Содержание PV-ezRack SolarTerrace Eco

Страница 1: ...PV ezRack SolarTerrace Eco EU Installation Guide NO PZ046 IM04 10 Content 1 Production Introduction 2 2 Tools Components 3 3 System Overview 7 4 Installation Instructions 9...

Страница 2: ...nt 1 simple introduction of installation 2 product installation specification Please use it according to the installation instruction manual which complies with GB50009 2012 JIS 8955 2017 ASCE7 10 ISO...

Страница 3: ...cn 2 Tools Components 2 1 Tools Tools Allen Key 6mm M8 Hexagon Socket Screw Socket Wrench M8 M12 Torque Wrench Electric Drill 5m Tape Marker String Total Station or Equivalent device Pile Driver Note...

Страница 4: ...8 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn 2 2 Components Components EC W A End Clamp ICII W A Module Inter Clamp II R TW TW Rail SP TW Splice for TW Rail S Eco W Support ER...

Страница 5: ...g to avoid galling or seizing in the threads General installation instructions 1 Apply force to fasteners in the direction of thread 2 Apply force uniformly to maintain required torque 3 Professional...

Страница 6: ...attention to below tips In order to protect the Zin coating of ground screws from scratches and peeling Please be careful while unloading In order to protect the ground screws from coating wear and st...

Страница 7: ...92 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn 3 System Overview 3 1 Composition 1 End Clamp with W Module 2 Module Inter Clamp II 3 TW Rail 4 Splice for TW Rail 5 Supp...

Страница 8: ...ina sales clenergy com cn 3 2 Installation Planning 1 PV Module Orientation Portrait 2 Rail Length per table L2 according to engineering drawings 3 Distance between the two adjacent supports L1 accord...

Страница 9: ...c If you have any questions please contact and consult the customer service 4 1 2 According to the installation planning use Total station or any instrument of similar functions to carry out positioni...

Страница 10: ...all aligned 4 2 2 Before installation it looks as shown Figure3 Unfold the Rectangular Tubes as shown in Figure 4 Unlock the M12 85 Bolts from the Slot U Shape Joint Insert the end of 2 free end Recta...

Страница 11: ...of Front Rear leg is 30mm the East west adjustable range of Front Rear leg is 20mm as shown in Figure 7 4 2 4 Fasten all bolts according to the torque Check all bolts and ensure they are fastened with...

Страница 12: ...of TW Rail and then insert the other Splice into TW Rail and fasten with Self tapping screws as shwon in Figure 9 NOTE Please fasten the Self tapping screws until its rubber washer attach the TW Rail...

Страница 13: ...Xiamen Fujian China sales clenergy com cn 4 3 4 Repeat the above steps to install other rails Make sure the rails in the same line aligned over same horizontal level Ensure the distances of rails bet...

Страница 14: ...shown in Figure12 Insert M8 30 through the hole on Angel AL Lightly lock another Connector for Rectangular Tube on the next span rear leg and adjust its position to lock the Angel AL and make it be i...

Страница 15: ...e channel of the Rail as shown in Figure 14 4 5 2 It is suggested to install PV Module from the left side and use the End Clamp and Inter Clamp to fix it Stretch a String as a reference to align PV Mo...

Страница 16: ...rom left to right Make the side faces of PV Module tightly against Clamps as shown in Figure 18 Any adjacent side face of PV Module keep the distance of 20mm as shown in Figure 16 Note Put an Inter Cl...

Отзывы: