background image

 

                                                                      

 

2

 / 

16

                                                                          

 
 

Clenergy China    

 

 

 

     

              Tel86 592 311 0088 

999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone 

 

 

Fac86 592 599 5028 

Xiang'an District 361101, Xiamen, Fujian, China 

 

 

[email protected] 

 

1. Production Introduction 

Clenergy PV-ezRack®SolarTerrace Eco (hereinafter referred to as ST Eco) is a 

pre-assembled ground PV-Module mounting system, which is suitable for large-

scale commercial installation and multi-purpose installation.ST Eco has been 

developed as a mounting system for various PV-module. Innovative and unique 

Rail with M Module is convenient and helps to improve the installation precision. 

Using high quality engineered components SolarTerraceEco more suitable for 

areas with higher salinity, and saves developers and installers, time and money 

when delivering large scale projects. 

Before system installation, please read the installation instruction manual carefully. 

The manual provides the following content: (1) simple introduction of installation; 

(2) product installation specification; 

Please use it according to the installation instruction manual, which complies with 

GB50009-2012, JIS 8955-2017, ASCE7-10, ISO 14713 and other building codes. 

Please pay attention to safety when installing the product, and construct it 

according to local laws and regulations. You can confirm the latest installation 

instruction manual on www.clenergy.com.cn if necessary.  

Installation personnel shall conform to the following specifications 

Conform to all local or national construction specifications that can replace the 

manual; 

Guarantee that Clenergy mounting products are applicable to specific 

installation and installation environment; 

Please use Clenergy’s accessories and your installation tools. (Clenergy will 

be not liable to other accessories that replace Clenergy’s ones); 

Recycle according to local related laws; 

Disassembly is corresponding to installation steps; 

The number of solar plate installation personnel shall be not less than 2; 

Guarantee that installation of electric equipment is finished by professional 

electricians.  

Содержание PV-ezRack SolarTerrace Eco

Страница 1: ...PV ezRack SolarTerrace Eco EU Installation Guide NO PZ046 IM04 10 Content 1 Production Introduction 2 2 Tools Components 3 3 System Overview 7 4 Installation Instructions 9...

Страница 2: ...nt 1 simple introduction of installation 2 product installation specification Please use it according to the installation instruction manual which complies with GB50009 2012 JIS 8955 2017 ASCE7 10 ISO...

Страница 3: ...cn 2 Tools Components 2 1 Tools Tools Allen Key 6mm M8 Hexagon Socket Screw Socket Wrench M8 M12 Torque Wrench Electric Drill 5m Tape Marker String Total Station or Equivalent device Pile Driver Note...

Страница 4: ...8 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn 2 2 Components Components EC W A End Clamp ICII W A Module Inter Clamp II R TW TW Rail SP TW Splice for TW Rail S Eco W Support ER...

Страница 5: ...g to avoid galling or seizing in the threads General installation instructions 1 Apply force to fasteners in the direction of thread 2 Apply force uniformly to maintain required torque 3 Professional...

Страница 6: ...attention to below tips In order to protect the Zin coating of ground screws from scratches and peeling Please be careful while unloading In order to protect the ground screws from coating wear and st...

Страница 7: ...92 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn 3 System Overview 3 1 Composition 1 End Clamp with W Module 2 Module Inter Clamp II 3 TW Rail 4 Splice for TW Rail 5 Supp...

Страница 8: ...ina sales clenergy com cn 3 2 Installation Planning 1 PV Module Orientation Portrait 2 Rail Length per table L2 according to engineering drawings 3 Distance between the two adjacent supports L1 accord...

Страница 9: ...c If you have any questions please contact and consult the customer service 4 1 2 According to the installation planning use Total station or any instrument of similar functions to carry out positioni...

Страница 10: ...all aligned 4 2 2 Before installation it looks as shown Figure3 Unfold the Rectangular Tubes as shown in Figure 4 Unlock the M12 85 Bolts from the Slot U Shape Joint Insert the end of 2 free end Recta...

Страница 11: ...of Front Rear leg is 30mm the East west adjustable range of Front Rear leg is 20mm as shown in Figure 7 4 2 4 Fasten all bolts according to the torque Check all bolts and ensure they are fastened with...

Страница 12: ...of TW Rail and then insert the other Splice into TW Rail and fasten with Self tapping screws as shwon in Figure 9 NOTE Please fasten the Self tapping screws until its rubber washer attach the TW Rail...

Страница 13: ...Xiamen Fujian China sales clenergy com cn 4 3 4 Repeat the above steps to install other rails Make sure the rails in the same line aligned over same horizontal level Ensure the distances of rails bet...

Страница 14: ...shown in Figure12 Insert M8 30 through the hole on Angel AL Lightly lock another Connector for Rectangular Tube on the next span rear leg and adjust its position to lock the Angel AL and make it be i...

Страница 15: ...e channel of the Rail as shown in Figure 14 4 5 2 It is suggested to install PV Module from the left side and use the End Clamp and Inter Clamp to fix it Stretch a String as a reference to align PV Mo...

Страница 16: ...rom left to right Make the side faces of PV Module tightly against Clamps as shown in Figure 18 Any adjacent side face of PV Module keep the distance of 20mm as shown in Figure 16 Note Put an Inter Cl...

Отзывы: