4.5.3 Fix the rest of PV-
Module according to the
sequence: from low to up,
from left to right. Make the
side faces of PV-Module
tightly against Clamps as
shown in Figure 18. Any
adjacent side face of PV-
Module keep the distance
of 20mm, as shown in
Figure 16.
Note:
Put an Inter Clamp at
each side of PV-Module to
keep the distance of
20mm and take them
away after the PV-Module
being fixed.
4.5.4 Now the installation
of a single array is
completed as shown in
Figure 17.
Please recheck all bolts,
and fasten them tightly.
Figure 16
Figure 17