10
/
16
Clenergy China
Tel86 592 311 0088
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Fac86 592 599 5028
Xiang'an District 361101, Xiamen, Fujian, China
4.2 Pre-assembled Support Installation
4.2.1 Before installing Pre-
assembled Support, check
the ground screws are on
the same level and are all
aligned.
4.2.2 Before installation, it
looks as shown Figure3.
Unfold the Rectangular
Tubes as shown in Figure
4.
Unlock the M12*85 Bolts
from the Slot U-Shape
Joint. Insert the end of 2
free
end
Rectangular
Tubes into the Slot U-
Shape Joint. Lightly lock
them with M12*85 Bolts.
Here, please note the
orientation of the 2 sets of
bolt; make sure their head
are in the same side with
other bolts. Rotate the
Corrugated
L-anchor
Plates to make them in a
same horizontal level, as
shown in Figure 6.
Figure 3
Figure 4
Figure 5
Figure 6
后立柱
后立柱