Installation Guide_PV-ezRack ComT V2.0 (September 2020)
5.4.1 According to the installation plan and
MT-rail cable tray load vs. span data below,
mark fixing positions of Cable Tray on top of
ECO rail.
5.4.2 Insert the Z module with bolt (EZ-Z-
STBW) into the slot hole of Cable Tray for
each fixing point, as shown in Figure 15.
5.4.3 Position the Cable Tray on the top of
ECO Rail by installing z module into the top
channel as shown in Figure 16. Leave z
module untighten.
Figure 14
Figure 15
Figure 16
Installation Instruction
5.4 MT-rail Cable Tray Installation (optional)
The installation instruction below is to take ECO Rail as an example, the installation instruction of T-rail is the
similar.
Load vs.span data:
LOAD PER METER
2.5m
2.0m
1.5m
1.0m
38 kg
59 kg
106 kg
239 kg
SP
AN