Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
09
page
of 17
Installation Guide_PV-ezRack ComT V2.0 (September 2020)
Installation Instruction
5.1 Tin Interface with ECO Rail Installation
When using the Tin Interface (ER-I-05 as
an example) with ECO Rail solution, please
follow the steps below.
5.1.1 Fix the Tin Interface on the metal purlin
with a self-tapping screw (Clenergy Tin
interface is equipped with one Buildex 14-
11 x 70 Hex Head Zips screw) according
to the installation plan. Ensure that the Tin
Interface in the front and rear or left and right
directions are aligned using string as shown
in Figure 1.
5.1.2 Fix the Rail on the Tin Interface as
shown in Figure 2.
Recommended torques:
M8 Bolt:18-20N·m
4.3 Installation Dimensions
All drawings and dimensions in this installation guide are a generic reference only. The PV-
ezRack
®
ComT™ is to be optimized to suit specific conditions for each project and documented
in engineering drawings. As a result, major components of the PV-ezRack
®
ComT™ may be
provided in sectional sizes and lengths that vary from those shown in this guide. The installation
operations detailed in this instruction guide remain the same regardless of the component size.
In the case that any on-site modification or alteration of the system is neededplease provide
marked up drawings/sketches for Clenergy’s review prior to modification for comment and
approval.
5. Installation Instruction
Figure 1
Figure 2