9
0
2
8
-
B
C
START-UP / SERVICE
REPORT
Test Conducted
GAS
OIL
Low
50%
High
Low
50%
High
Firing Rate MMBtu / gph
Stack Temp (Gross) oF
Room Temp oF
O2%
CO2%
CO (PPM)
NOx (PPM)
Smoke (Bacharach)
Combustion Eff.%
Stack Draft "W.C.
Furnace Pressure "W.C.
Blast tube Pressure "W.C.
Steam Pressure PSIG
Water Temperature oF
Supply oil pressure PSIG
Return oil pressure PSIG
Vacuum oil pump "HG
Oil Temperature
Atom. air pressure
Gas Pressure @ Burner
Inner Manifold
Manifold "W.C.
Outer Manifold
Center Gas pressure "W.C.
Gas Pressure @ Regulator Inlet PSIG
Gas Pressure @ Regulator Outlet PSIG
Pilot Gas Pressure @ Regulator Outlet "W.C.
Flame Signal Main
Low 50% High
Control Checks
Test
Set Point
Low Water Cut Off
Aux. LWCO
High Water Cut Off
Operating Limit
High Limit
Operating Control
Stack Temp Interlock
Flame Failure
Combustion Air Switch
High Purge Switch
Low Fire Interlock
Oil Pressure Switch
Oil Valve with P.O.C.
Interlock
High Gas Pressure
Switch
Low Gas Pressure
Switch
Gas Valve P.O.C.
Interlock
Pilot Turndown Test
Flame Signal Pilot
(For Low NOx Burners)
Blast Tube Temp.
Interlock
FGR Line Purge Switch
FGR Valve P.O.C.
Switch
Voltage
Amperage
Electric Motors
L1
L2
L3
L1
L2
L3
Control Voltage
Blower Motor
Air Compressor
Air-Oil or Metering
Adjusted by:
Date:
Accepted by:
(Signature Required)
The following information should be filled in by the service technician at start-up or after any adjustment to the burner.
A copy of the start-up report MUST be returned to CB in order to validate the warranty of the burner.
Burner Model
Serial Number
Start-up Date
Profire V Burner
Chapter 2
750-177
2-55
Содержание FLX 1000
Страница 12: ...Chapter 1 General Description 1 6 750 177...
Страница 68: ...Chapter 2 Profire V Burner 2 56 750 177...
Страница 90: ...Chapter 4 Sequence of Operation 4 10 750 177...
Страница 104: ...Chapter 5 Adjustment Procedures 5 14 750 177...
Страница 110: ...Chapter 6 Troubleshooting 6 6 750 177...
Страница 122: ...8 2 750 177 Figure 8 1 Typical Hot Water Flextube Casing...
Страница 124: ...8 4 750 177 Figure 8 2 Typical Low Pressure Steam Flextube Casing...
Страница 126: ...8 6 750 177 Figure 8 3 Typical High Pressure Steam Flextube Casing...
Страница 128: ...Parts Chapter 8 8 8 750 177 Steam Pressure Controls...
Страница 129: ...Chapter 8 Parts 750 177 8 9 Water Level Controls...
Страница 130: ...Parts Chapter 8 8 10 750 177 Water Level Controls continued...
Страница 131: ...Chapter 8 Parts 750 177 8 11 Water Column Main and Aux 15 Steam...
Страница 132: ...Parts Chapter 8 8 12 750 177 Water Column Main and Aux 150 Steam...
Страница 133: ...Chapter 8 Parts 750 177 8 13 Safety Valves...
Страница 134: ...Parts Chapter 8 8 14 750 177...
Страница 135: ......
Страница 136: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...