7
CLEARWATER LM INSTALLATION
Clearwater LM Installation
Clearwater saltwater chlorinators must be installed by a qualified swimming pool
professional or certified electrician.
If you need assistance in finding a qualified installer
please contact our technical service department at 1-888-537-6657.
Installing the cell
The Clearwater cell MUST be installed horizontally, with the ports down, as the
last piece of pool equipment in line.
(The design of the cell forms a natural gas trap. Even
though the LM unit has an internal flow sensor, this installation provides a secondary safety
feature to prevent gas build-up within the system.) There are no height restrictions or
requirements. The cell should be installed within 6’ of the power pack. Unions and adaptors
are provided. Water can flow in either direction without affecting performance. 11/2" or 2"
sch 40 rigid PVC is required. Any standard PVC cement may be used. Allow adequate drying
time before turning on the chlorinator.
Содержание Zodiac LM2-24
Страница 1: ...LM Series Professional Installation Manual Owner s Manual Warranty Information ...
Страница 4: ...4 NOTES ...
Страница 13: ...13 LM2 Display Panel CONTROL PANEL FUNCTIONS ...