21
CLEARSPAN
™
POLY BUILDINGS
Revision date: 12.08.15
PREPARE MAIN COVER
Gather parts:
• Pipe 1.66" x 99" swaged
• Pipe 1.66" x XX" plain: The XX refers to the length of plain pipe needed to reach frame end and to complete conduit.
Consult Side Profile diagram in Quick Start section of these instructions to identify this pipe length.
• Main cover and Tek screws
Assembly Procedure
NOTE:
When handling main cover and setting it in position, do not pull on end straps. They will pull out of cover bonnet
pocket.
Do not insert any cover conduit into a cover pocket that includes a pre-installed strap.
WARNING:
To prevent damage to cover and to prevent serious personal injury, DO NOT attempt to install main cover
on windy days or when such conditions are expected.
1. Assemble two main cover conduits. Start each cover conduit assembly with one plain pipe and add swaged pipes to
arrive at the frame length. Conduits are used to tighten and secure the main cover.
Consult the Side Profile diagram in
Quick Start section for pipe identification.
2. After assembling cover conduits, locate main cover and unfold it on a clean, smooth surface near frame. Unfold cover
with inside surface facing up and straps positioned at front and back of frame.
3. Align cover ends with front and back of shelter and insert one cover conduit into each side pocket of cover.
a. Locate all sections of pipe needed to assemble
the cover conduit.
b. Insert swaged end of each pipe into plain end of
another pipe until conduit is assembled.
c. Secure each pipe joint with a Tek screw.
d. Use duct tape to tape over each Tek screw.
NOTE:
Shelter shown above may be of a different style or length than actual shelter.
4. Continue by pulling cover up and onto frame.
Cover Conduits
Cover
Ends w/
Strapping
Stretch Hem Pockets
(See note above.)
Side Pocket
Side Pocket
NOTE:
Stretch hem pockets are
found on covers for buildings
longer than 48'.
Rope or straps to pull
cover over frame.