CABLE PLACEMENT
Diagram and inserts below identify placement and proper
way to attach cable assemblies.
Do not tighten cables until frame is properly and securely
anchored as described in the Must Read document.
Carriage Bolt
NOTE:
Cable assembly positions are identical for opposite side and
remaining end of building.
Consult Side Profile diagram in Quick Start
section for rafter spacing and cable locations
.
View is from inside
the shelter.
Apply duct tape over
cables on end rafters
to protect the main
cover.
Carriage bolt runs through rafter
and top center purlin on 6th
rafter (depending on spacing) at
each end.
Attach band clamp (103856) above lowest pipe
strap (QH1070) on end rafters only. Once cable is
attached and clamp is tightened, secure clamp to
the rafter using a Tek screw.
View
is from
inside the
shelter.
103856
QH1070
ATTENTION:
Install
a carriage bolt in this
location at both ends of
the shelter.
Drill through rafter and
purlin to install bolt.
IMPORTANT! Tape
over cables to protect
cover.
Top, Center
Purlin
Top, Center
Purlin