Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
22
YOURx-Aerial Terminal
Installation Manual
_________________________________________________________
Manual 019588 REV B - Sept 2018
Step 7:
Perform your splices, stacking the splice sleeves
two high in the splice chips located in the center of the
splice tray.
Step 5:
Remove the 5m pre-loaded fiber
assembly from the central spools of the terminal and
bring it to your workspace.
Note:
In loose tube splicing applications, the fiber
assembly will consist of a 5m ribbon which as been
de-laminated for the last meter, resulting in twelve 250
micron loose tube fibers which will be taped to the top of
the splice tray area.
Step 6:
To secure the pre-loaded fiber assembly into the splice tray, refer back to the ribbon splicing section of this manual.
You will be using the split grommet and u-channel to secure the ribbon, just before it is broken out into loose tube, into the
splice tray.
Step 8:
After splicing is complete, replace the splice tray cover.
Step 9:
Bring the splice tray back to the YOURx-Aerial Terminal, placing the splice tray into the terminal by sliding the two
mounting holes on the tray over the two threaded studs in the splice tray area.
Note:
Consult the ribbon splicing section of this manual for images.
Step 10:
Route the excess slack, which was used to access the work space, back into the slack basket surrounding the
splice tray area of the terminal.
Step 11:
Secure the splice tray(s) (up to 3) in place with the provided velcro strap and two wing nuts, which will go on the
two threaded studs.
Step 12:
Close the YOURx-Aerial Terminal, latching the lid shut.