Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
30
YOURx Multi-Purpose Terminal
Installation Manual
_________________________________________________________
Manual 021023 REV A - Jan 2020
1.
Installing Duplex LC Pre-Connectorized Drops
2.
3.
4.
Begin by pushing one of the connectorized fibers through the
FlexPort.
Once the first fiber is through the FlexPort, bring the second fiber
through the port. Pull the Fibers Completely into the terminal.
Firmly seat the FlexConnector into the FlexPort.
Inspect and clean the connectors, then connect them to the
designated port.