Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
22
FieldSmart
®
Fiber Scalability Center (FSC)
Installation Manual
_________________________________________________________
Manual 009246 REV J - Feb 2020
Mount the cabinet base to the concrete pad per your local practice.
If the base is installed on the enclosure, remove the base by removing the 4 bolts from the bottom of the inside of the
cabinet. Position the enclosure base onto the pad (typically concrete). Assure that the 4 anchor locations in the enclosure
base align with the anchor locations in the pad. After verification of the anchor alignment, mount per your local practice.
Note:
Anchors are supplied by the customer, to comply with local rules and regulations. Be sure to use anchors with the
diameter dimensions which will fit the holes in the base/riser.
Optionally, you may choose to use the round cut outs for more flexibility in mounting the base. Place the rectangular washer
plates (found in the hardware package) onto the enclosure base, aligning the holes with the anchor locations in the pad (or
placing over cast-in-studs). Orient the plates to provide the most contact and support with the base/riser flange. Place the
base/riser on the anchor or cast-in-studs.
Run the nuts onto the anchors or cast-in-studs and
finger tighten them. DO NOT TIGHTEN the anchor nuts or cast-in-
stud nuts at this step.
Mounting Base on Concrete Pad/Vault Lid