Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
40
FieldSmart
®
Fiber Scalability Center (FSC)
Installation Manual
_________________________________________________________
Manual 009246 REV J - Feb 2020
288 PON Routing (Rear of Cabinet)
The suggested cable routing for feeder and
distribution cables is in the rear of the cabinet.
Note:
Cables should enter cassettes on side
closest to cable management – not crossed over.
576 PON Routing (Rear of Cabinet)
Suggested cable routing for feeder and distribution cables in the rear of the cabinet.
Note:
Cables should enter cassettes on side closest to cable management – not crossed over.