Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
38
FieldSmart
®
Fiber Scalability Center (FSC)
Installation Manual
_________________________________________________________
Manual 009246 REV J - Feb 2020
Pull the extra unopened cable slack back through the sealcon and out of the cabinet.
If utilizing a strength member clamp, bring the strength member over to the clamp and secure tightly.
17.
18.
Tighten the dome nut on the sealcon securely, being
careful not to damage the threads.
19.